"A purpose built facility to bring recycling to East Rockingham."
6 Lodge Drive, East Rockingham WA
Originally home to a water treatment plant for the adjoining wool scouring facility at 4 Lodge Drive, Realside Ovest is working with its tenant to reposition the site to a modern technologically advanced manufacturing facility.
With extensive regulatory requirements, this site shows the attention to detail needed through the design process as Realside Ovest works alongside the tenant to design an efficient and future proofed workshop and warehouse.
5.5938ha
Site size
14,356sqm
NLA
Development approved
Project Status
Project Details
Working closely with engineers & DFES. Manufacturing facility. Find innovative solutions to unlock the development potential of the site.
RAV7
Vehicle Access
10 tonne
Crane Capacity
200kw
Solar Array
Passive air flow design, high R-Value glass, LED lighting, timer and sensor based lighting
Sustainability feature